Upstream Operator Achieves Sub-15-Minute RTO for Production-Critical Workloads

Designing and delivering a fully validated DR landing zone on Azure for SCADA, historian, and production-critical applications.

Solution
Energy
Industry
Oil, Gas & Energy
Company Size

Project Overview

client
Upstream E&P Operator
industry
Oil, Gas & Energy
solution
Energy
technologies
Microsoft Azure, Azure Site Recovery, Azure VPN Gateway, Azure Firewall, Microsoft Sentinel
duration
6 Months
region
Europe

The Challenge

Production-critical OT and IT systems were running in a single primary datacenter with no validated cross-region DR posture, posing existential risk to production continuity.

  • 1Single-site exposure for SCADA, historian, and ERP workloads
  • 2Untested DR processes with unclear RPO/RTO commitments
  • 3Regulatory pressure to demonstrate validated BCP

Our Solution

CloudGate designed and deployed a complete DR landing zone in a secondary Azure region with validated failover procedures and security parity.

  • Hub-and-spoke DR landing zone in a paired Azure region
  • Zone-redundant Azure Firewall and active-active VPN for OT connectivity
  • Quarterly failover drills with documented runbooks and audit evidence

The Results

<15min
RTO ACHIEVED
<5min
RPO ACHIEVED
100%
FAILOVER TEST SUCCESS
  • Passed independent BCP audit on first attempt

Technologies Used

Microsoft AzureAzure Site RecoveryAzure VPN GatewayAzure FirewallMicrosoft Sentinel

Ready to transform your enterprise?

Join hundreds of organizations scaling securely with CloudGate's intelligent infrastructure solutions.